Compare

Patio, Pavers or a Deck for a Milwaukee County Backyard

Three questions, answered in order, that between them settle it for most yards around here. Written by a crew that pours one of the three and will say plainly when your garden is asking for one of the others.

Disclosure before anything else: we lay poured concrete and we do not install pavers or build decks. Read the rest with that in mind. It is also why the concessions below are worth something - there is nothing in it for us to hand a job to a joiner, so when this page does that, it is because the yard called for it.

Most comparisons of these three run material by material and leave you holding a table. That is not how the decision actually gets made. In practice three questions resolve it, and they have to be taken in this order, because the first one can close the discussion before the other two matter.

Question one: what does the ground behind your house do?

Go and stand at the back door and look at where you want to sit. If that spot is roughly level with the threshold, all three options are genuinely open and you can move to question two.

If the garden falls away, the field narrows quickly. Bringing a solid surface out to a usable height over a drop means either importing and compacting a large volume of fill, or building steps down and accepting that your seating area is not on the same level as your kitchen. Past roughly a couple of feet of fall, a raised timber structure is not a style preference any more, it is the appropriate way to build on that ground, and any honest contractor will say so.

The reverse case is worth naming too. On flat ground close to the house, a deck built where a slab would have served puts timber a few inches above soil for no structural reason, and that is the least forgiving place to put timber in this climate.

There is a drainage half to this question as well. Whatever gets built has to shed water away from the house. A poured surface does that by being sloped when it is placed, and getting it wrong is difficult to undo afterwards. Pavers can be adjusted later. A deck sheds through its gaps and largely sidesteps the issue.

Question two: are you willing to maintain a surface, or would you rather not think about it?

This is where the three genuinely diverge, and it is worth being honest with yourself about the answer rather than aspirational.

A concrete slab asks almost nothing. Keep chemicals off it, particularly through its first winter, sweep it out in spring, and revisit a sealer every few seasons. There is no annual task. Around here, the one thing that does shorten a patio's life is treating it like a pavement in January, and the reasoning behind that is set out in our Milwaukee County patio cost guide.

A paver field asks for attention on a schedule the ground sets rather than you. Freezing and thawing soil lifts and settles unevenly, and because the surface is assembled from hundreds of separate pieces, that movement appears as edges standing slightly proud of one another. Sand migrates out of the joints. Weeds find the gaps. None of this is difficult work and plenty of people enjoy doing it, but it recurs, and it recurs faster on ground that freezes to depth.

A deck asks for a cycle you can predict but cannot skip: cleaning, then staining or sealing, then eventually boards. Predictability is genuinely worth something. You know what the next ten years costs and roughly when.

Question three: what do you want to be doing in year eight?

Everything above is about the first season. The choice separates most clearly a long way out, and the first invoice is a poor guide to it.

By year eight a concrete patio, if it was built on properly prepared ground with joints cut on a plan, looks much as it did, a shade darker, with the joints doing exactly what they were cut to do. If it was built badly, year eight is also when you find out, and the fault will almost always be underneath rather than in the mix.

By year eight a paver patio has been re-levelled at least once and probably re-sanded more than that, and it can be lifted and reset again indefinitely, which is a real advantage nobody should dismiss. If you want a surface that can be taken up in sections and put back, this is the only one of the three that offers it.

By year eight a deck has been refinished several times and is approaching its first significant board replacement, particularly on the horizontal surfaces that take the weather.

Where each one is simply the right answer

  • Poured concrete when the ground is close to level, you want furniture to sit flat, and you would rather not have a maintenance task in the calendar. It is also the only one of the three that carries a grill, a hot tub or a vehicle without a conversation about load.
  • Pavers when you want the look of individual units, when the design has curves and borders that read better assembled from small pieces, or when the ability to lift and reset a section later is worth the recurring work.
  • A deck when the ground drops away, when you want to be at the same height as the back door regardless of what the garden does, or when you want a warm surface underfoot early in the season.

Combining them is normal, not a compromise

On a sloping lot the best answer is frequently more than one of these. Put the slab where the soil will carry it at the height you want to step out onto, drop steps from there, and let a raised structure cover the ground that will not take a slab. Choosing concrete for the part of the garden that suits concrete rules nothing else out. Some of the better back gardens in this area are two materials meeting at a step.

If concrete is the answer for your garden

Four quick questions and a local concrete contractor will be in touch to set up a free on-site estimate for concrete patio work across Oak Creek and the south suburbs. We mark the outline out on the grass first, so you can walk around inside it before anything is committed.

Request an estimate

And if the three questions above pointed somewhere else, that is a good outcome. The expensive mistake in this category is not choosing the wrong material, it is choosing a material that fights the ground it was put on.

Sources

  1. Wisconsin Ready Mixed Concrete Association - regional flatwork care, curing, sealing intervals and deicer guidance.
  2. NRMCA CIP 2 - surface scaling and the freeze-thaw mechanism behind it.
  3. Wis. Admin. Code SPS 321.16 - footing depth for structures, which is why a raised deck and a slab on grade are governed by different rules.

Request an Estimate

Get your free, on-site estimate.

Tell us about your project and we'll call you back the same day to set up a free measure and price.

Get your free quote

Tell us about your project and we will call you back the same day. No obligation.

What are you looking to do?
Roughly how big?
When are you thinking?

Pricing it out is fine. We will not chase you.

What is your ZIP code?

So we can confirm you are in the service area.

Where should we send it?

Free, no-pressure estimate · Serving Milwaukee County, WI

By submitting, you agree to our Privacy Policy and Terms, and consent to be contacted by phone, text, or email about your project, including by automated means. Consent isn't a condition of purchase. Msg & data rates may apply.

Call us - get a free quote